top of page
Base of the tower comprises of VIP ceremonial entrance surrounded with lush greenery and water feature to create more pleasing and welcoming effect.
Materials selected for hardscape and wall finishes complement façade design ensuring seamless look and feel and well-coordinated design.
Natural tones and materials soften the building mass Planting species even though with rich foliage and color are local and adaptive ensuring low water consumption and sustainable design.
Internal planting was carefully selected in coordination with interior design to provide desired ambiance to internal space.
Client:
Capital Markets Authority
Completion:
Design Completed 2021 Construction Ongoing 2023
Estimated Cost:
$ 157 Million
Built-up-Area: 69,000 sq m
Services Provided:
Landscape Architecture
Public Realm Design
Internal Planting
In Association with:
KEO – Lead Consultant and Engineer
C-Quest – Cost Consultant
Concept Architect:
Kohn Pedersen Fox
bottom of page